$1 Billion Solar Power Plant To Be Built in the Mojave Desert
Utility giant FPL has filed plans with California regulators to build a $1 billion, 250-megawatt solar power plant in the Mojave Desert. The move marks the first time that a major player — in this case a Fortune 500 company — has jumped into the nascent Big Solar market.A billion here, a billion there all of a sudden you are talking about real money. I expect that many more solar plants will be built in the Mojave Desert in the near future. I wonder though if there is enough transmission capacity to send the electricity to Los Angeles or if that will constrain growth.
Juno Beach, Fla.-based FPL’s renewable energy arm, FPL (FPL) Energy, will operate the Beacon Solar Energy Project, which will connect to the transmission system operated by Los Angeles’ municipal utility, the Los Angeles Department of Water and Power. FPL Energy spokesman Steve Stengel declined to say whether the company had struck a deal with LADWP to buy the electricity produced by the Beacon project.
O’Sullivan estimated the project would create 1,000 jobs during the two-year construction phase and 66 permanent positions once it goes online in 2011.
via Green Wombat
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.